Arrow Group Industries ML86-A Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Nein Arrow Group Industries ML86-A herunter. WH1014-D1 - Arrow Sheds Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 35
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
* Size rounded off to the nearest foot
BUILDING DIMENSIONS
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
714890108
Model No. WH1014-D1
Owner's Manual & Assembly Instructions
ST01
Exterior Dimensions Interior Dimensions Door
*Approx. Foundation Storage Area (Roof Edge to Roof Edge) (Wall to Wall) Opening
Size Size Sq. Ft. Cu. Ft. Width Depth Height Width Depth Height Width Height
10' x 14' 121" x 160 1/4" 129 852 123 1/4" 162 3/4" 87 7/8" 118 1/4" 157 1/2" 86 5/8" 55 1/2" 60"
3,0m x 4,0m 307cm x 407cm 12,0m
2
24,1m
3
313cm 413cm 223cm 300cm 400cm 220cm 141cm 152cm
Seitenansicht 0
1 2 3 4 5 6 ... 34 35

Inhaltsverzeichnis

Seite 1 - Model No. WH1014-D1

* Size rounded off to the nearest footBUILDING DIMENSIONSCAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AV

Seite 2 - BEFORE YOU BEGIN

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring. Anchoring Down The Buil

Seite 3 - PLAN AHEAD

11Remove from bag of screwsand save for the last step67545 (21')Weather Stripping (1)65958#8-32x7/8" Bolt (14)(Packed with Screws)66382Lower

Seite 4 - SAFETY FIRST

Parts List ST1212 Assembly Part Part Quantity Check Key No. Number Description in Carton List 1 5291 Front

Seite 5 - CARE & MAINTENANCE

13Assembly by Key No. ST13

Seite 6 - ACCESSORIES

The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will

Seite 7

Step 2ST1515● Parts Needed For ●Frame AssembliesThe main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at t

Seite 8

16The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. Th

Seite 9 - Foundation

17NOTE:Door Track Splice (painted part)Step 4A17● Parts Needed For ●Door Track Assembly●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)66769S

Seite 10 - Anchoring

●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)● Parts Needed For ●Floor FrameStep 5SO18The floor frame must

Seite 11 - Hardware

1 Position right & left corner postsat the corners of the floor frame asshown. The angled end of each postmust be placed on top of all fourcorner

Seite 12 - Parts List

2Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand

Seite 13 - Assembly by Key No

The splice posts support the walls.1 Position a rear splice post at thecenter of the rear wall and fastenusing 2 nuts and bolts into rear wallangle an

Seite 14 - Floor Frame Assemblies

The door jambs reinforce the dooropening and provide an attractivetrim.●●●●● 8717 Door Jamb (2)● Parts Needed For ●Door JambStep 8ST212187171STEPNOTCH

Seite 15

22●●●●● Side Wall Channel Assemblies (2)●●●●● Rear Wall Channel Assembly (1)●●●●● 9003 Stud (10)●●●●● 9365 Front Wall Channel (2)● Parts Needed For ●M

Seite 16 - Roof Beam Assemblies

Each screw in the wall requires awasher.1 Slide side siding (5 board) intochannels of corner and splice posts,flat edge upward, slotted edge downresti

Seite 17 - 2 Insert four screws

24The gables go on top of the front andrear walls to support the roof beams.NOTEThe gables are packed nestedtogether and might be mistakenas one piece

Seite 18 - Floor Frame

● Parts Needed For ●Gables/Roof BeamsStep 12ST25●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● Single Roof Beam Assemblies (4)●●

Seite 19 - Posts/Top Frames

● Parts Needed For ●Roof Beam/BracesStep 13SS26●●●●● Main Roof Beam Assembly (1)●●●●● 6227 Roof Beam Brace (2)261 Fasten the track supports to thefron

Seite 20 - Splice Post

27Step 14ST27● Parts Needed For ●Right Roof Panel●●●●● 7862 Right Roof Panel (1)Installing the roof panels is best donewith a step ladder. Begin insta

Seite 21 - Door Jamb

1 Install a left roof panel at the leftrear corner of the roof.2 Install two roof panels in the se-quence shown on previous page.Follow fastener sequ

Seite 22 - 28 1/4"

29Step 16ST291 Install four roof panels as youunroll the weather stripping tape, andpress it down, install the second ridgecaps 6869 overlapping the

Seite 23 - ● Parts Needed For ●

3Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with go

Seite 24 - Gable Assemblies

1 Install two roof panels, left roofpanel, three ridge caps 6797 andright roof panel on the front of theroof as before.2 Fasten the roof panel ribs, p

Seite 25 - 2 Fasten a single roof beam

1 Attach the right and left side rooftrim to the lower end of the roof pan-els on each side of the building usingscrews at each panel overlap.NOTEA si

Seite 26 - Weather Stripping

32●●●●● 67730 Foam Board (2)●●●●● 10509 Right and Left Doors (2)●●●●● 10501 Horizontal Door Brace (4)●●●●● 8109 Vertical Door Brace (2)● Parts Neede

Seite 27 - Right Roof Panel

Step 20ST33● Parts Needed For ●Door Installation & Adjustment●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)1 From inside the building,

Seite 28

SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfin

Seite 29 - Roof Assembly

714890108WH1014-D1ST36

Seite 30

4Safety precautions are important to follow throughout the construction of your building.•Care must be taken when handling variouspieces of your build

Seite 31 - Roof Trim

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immedia

Seite 32

ACCESSORIES... A6 WEB6* Some drilling required to fit buildings without mid-wall bracing.Model No. SS404• Makes 8" to 12" (20-30cm)

Seite 33

THIS PAGEWA SLEFTBLANKINTENTIONALLY7

Seite 34 - SOME FACTS ABOUT RUST

THIS PAGEWASLEFTBLANKINTENTIONALLY8

Seite 35 - WH1014-D1

The Foundation For Your Building9FRONT(DOOR)FRONT(DOOR)Foundation F09Note: Finished Slab dimensions, with lumber removed.OPTION 1: ARROW FLOOR FRA

Kommentare zu diesen Handbüchern

Keine Kommentare